Tob Poc War Room

核心功能为基于POC关键数据诊断风险等级、分类阻塞问题、制定48小时闭环计划、识别客户沉默风险、生成战情报告,判断是否进入合同阶段。适用于ToB AI项目POC阶段的进度管控、风险排查与结项决策场景。需输入POC目标、进度、通过率等关键信息,输出结构化战情分诊报告。

william202404
william202404
热度 40.21
最近更新 2026-07-08 00:17:41
分类:协作依赖:纯提示词应用场景:任务管理 / 报告撰写 / 工作流

安装技能

复制下面的话术发给你的 Agent,它会通过 secure-skills 检索并安装该技能。

执行命令安装此 skill: npx secure-skills-cli add tob-poc-war-room
Metadata
name
tob-poc-war-room
slug
tob-poc-war-room
displayName
POC战情室
version
1.0.0
description
POC war-room skill for ToB AI delivery. Use when a user needs to diagnose POC status, track pass rate, classify blockers, build a 48-hour closure plan, detect customer silence risk, generate daily POC war-room reports, or decide when a POC is ready to enter contract closing.
priority
critical
source
field-experience
workers
["tech","pm","sales"]
created
"2026-06-03T00:00:00.000Z"
updated
"2026-07-06T00:00:00.000Z"
tags
["tob","poc","delivery","war-room","risk-control"]

tob-poc-war-room

Use this skill to run a ToB POC like a war room, not a loose project tracker.

The goal is to convert POC facts into:

  • current risk level
  • blocker ownership
  • 48-hour closure plan
  • customer communication move
  • decision on whether to trigger poc-to-contract-closer

Do not output generic project-management templates. Every output must tie back to concrete POC signals.

Required Inputs

Ask for missing essentials only when they change the decision:

  • POC objective and acceptance criteria
  • current day or phase
  • pass rate or accepted test count
  • open issue list with severity, owner, age, and next action
  • customer feedback or silence duration
  • decision maker / champion status
  • competitor or parallel POC signal, if any

If inputs are incomplete, still produce a triage note and list the missing evidence.

Field Rules

Pass Rate

  • >=90%: technically closeable if no P0 blocker remains.
  • 70-89%: yellow; focus the next 48h on the smallest set of blockers that affect acceptance.
  • <70%: red; do not talk contract yet unless customer scope changed.
  • Unknown pass rate: red-yellow; first action is to force a measurable acceptance baseline.

Use the 93% pass-rate pattern as a reference signal, not a promise.

Blockers

Classify each issue:

  • P0: blocks acceptance or executive demo.
  • P1: affects key user confidence but has workaround.
  • P2: cosmetic, edge case, or post-POC backlog.

48h rule:

  • P0 older than 48h without owner/action is red.
  • P1 older than 48h becomes yellow-red if it affects the champion's narrative.
  • P2 should not consume war-room attention unless customer names it.

Customer Silence

  • 0-2 days: normal, continue planned follow-up.
  • 3 days: proactive touchpoint required.
  • 7 days: danger signal; trigger executive/champion path and closing diagnosis.
  • Silence after successful demo is not neutral. Treat it as an unowned buying-process risk.

Ownership

No output may contain an action without:

  • owner
  • next step
  • deadline
  • expected evidence

If owner is unknown, assign a role placeholder such as Tech owner, Sales owner, or Customer champion.

Trigger To Closing

Trigger poc-to-contract-closer when:

  • pass rate is >=90%, or
  • all P0 blockers are closed and customer has accepted the core value, or
  • the POC has entered final demo / recap / procurement discussion, or
  • customer silence appears after a successful POC and the buying process must be restarted.

Do not trigger closing when the POC is still proving basic feasibility.

Output Format

## POC War-Room Triage

### 1. Status
- Phase:
- Risk: Green / Yellow / Red
- Pass rate:
- Main reason:

### 2. Blocker Table
| Issue | Level | Age | Owner | Next action | Deadline | Evidence |

### 3. Next 48 Hours
1.
2.
3.

### 4. Customer Move
- Message objective:
- Recommended message:
- Who sends it:
- When:

### 5. Escalation
- Escalate? yes/no
- Escalation target:
- Reason:

### 6. Closing Trigger
- Trigger `poc-to-contract-closer`? yes/no
- Reason:
- Inputs to pass forward:

Acceptance Example

Input:

POC day 5. 14/15 tests accepted. One SSO issue open for 60h. Customer champion likes results, but procurement not involved. No customer reply for 3 days after demo.

Expected reasoning:

  • pass rate is green, but SSO age and customer silence create yellow risk.
  • next 48h must close SSO or document workaround.
  • Sales should restart champion/procurement path.
  • trigger poc-to-contract-closer with the risk flagged, because the POC is technically closeable.

Boundaries

  • Do not invent customer names, project names, exact contract amount, or private data.
  • Do not promise conversion probability.
  • Do not call a POC successful if acceptance criteria are missing.
  • Do not bury a P0 blocker under a positive summary.