Telesherpa Maintenance & Inspections

该 Skill 指导代理通过 Telesherpa 平台的 MCP 工具分三阶段(0–2)配置维保巡检工作区:建立三个作用域与权限、激活 serviceOrder 类型及其属性、录入资产与周期巡检工单并用 concerns/ofAsset 关联、创建过期/30天内/全部未结/缺陷四个视图与团队开始卡片,以及记录巡检表单和缺陷上报表单;要求每次写入后回读,并以 17 步验收场景作为完成标准。

分类:自动化
telesherpa
telesherpa
热度 40.03
最近更新 2026-11-26 05:04:44

安装

发给 Agent
帮我安装这个技能:npx secure-skills-cli add telesherpa/telesherpa-maintenance-inspections
兼容性
通用兼容
联网要求
需要联网
数据出网
必须出网
Metadata
name
maintenance-inspections
description
Use when an agent must set up maintenance and inspection deadlines on Telesherpa — three scopes (master data, maintenance, team), assets with recurring serviceOrders as the source of truth for each due date, views for overdue / due in 30 days ({today} to {today+30}) / all open inspections (excluding defects) / defects, start cards in the team scope, a form that records an inspection (result, note, photos, signature, date, optional next due date) and updates the same open order, and a form that reports a defect on an asset. Also use when extending or auditing such a workspace.
version
1.0
author
Telesherpa
license
MIT
platforms
["linux","macos","windows"]

Maintenance and inspection deadlines (Telesherpa industry solution)

Location in the repo: industry-solutions/maintenance-inspections/, next to telesherpa-ontology-platform/ and industry-solutions/shift-planning/. Load the platform skill first (telesherpa-ontology-platform/SKILL.md); this skill assumes you can register, authenticate and call MCP tools.

Language: this file is English because agents read it. Answer the customer in their language. Keep tool names and JSON keys verbatim. Option values are plain English strings with no translation layer (see phase 0). The placeholders {today} and {today+N} are platform values — do not replace them with a fixed date. Labels shown to the customer's staff are set in the label language agreed in intake. Tool responses and error texts may use the platform language. Read the returned allowed keys and error meaning; never translate keys or option values back into a call.

Reuse, do not copy. People, sites (organisation, building) and the three-scope pattern already live in shift-planning. If that workspace exists for the same business, reuse its master data (and, if the intake says so, its team door). Link to those files; do not duplicate their recipes here.

Before you claim anything — the checks

A workspace is not set up because objects exist. Before you write any progress or completion report, run these checks and quote the values you read back. A statement without numbers from a read-back is a claim, not a status.

# Check Query
1 The three scopes exist with the agreed suffixes, and you are manager of all three ontouser_scope_index
2 Per scope: number of objects, members, managers onto_scope_index (fields obj_count, user_count, manager_count)
3 The type serviceOrder in the maintenance scope carries dueDate (date), intervalDays (int), intervalKm (int, optional), lastDone (date), kind, orderKind (scheduledInspection / defect / contractMaintenance / inspectionProtocol), result (pass / defect) and inspectionNote onto_type_show
4 Views exist, and the start cards are registered in the team scope and point at team-scope views onto_settings_list / onto_interface_index per scope, onto_startcard_index
5 record_inspection is a form_answer action bound to its form; apply_inspection and its insert and update triggers are present; report_defect is present; both actions write to the maintenance scope (result_scope_id) onto_actiondef_list, show_formdef, function and trigger index/show
6 Objects per type match the intake (business, site, people, assets, service orders) onto_object_index
7 One open scheduled inspection really points at its asset, and the due date sits on that order onto_object_graph on the order (concerns with linkvalue ofAsset); onto_object_show (dueDate, kind, orderKind, orderStatus)
8 One real end-to-end step as manager: record an inspection with a result, an inspection date, a photo and a signature; the same order stays open and its next due date is either the date typed or, if that field was left empty, the inspection date plus intervalDays the form in the browser, then a read-back of the duty (result, lastDone, dueDate, orderStatus) and of the protocol (orderKind=inspectionProtocol, concerns / ofOrder)
9 One defect reported on an asset appears in the defects view and not in all open inspections the form action, then the two views
10 The credit balance you report is the one you measured onto_credit_balance

A status message names its stage — "stage X of 2 (0–2)". "Everything is set up" is not a status: it names no phase, no number and no check. If you cannot fill the table, you are not done, and the correct answer is the missing line, not a summary.

Status

Field Content
Verified against platform schema 2026-11-16 (Europe/Berlin). Types, properties, links (concerns with ofAsset and ofOrder) and the views, forms, function and triggers below were read with member tools on that date. The manager path — including the record-inspection form, photos, signature and the automatic next due date — was executed and read back in the browser on that date. Treat points marked "(confirm)" as open until they are quoted from your workspace.
Status Version 1.0. Recurring inspection duties as serviceOrder rows, the four lists, the team start cards, record_inspection (a form; the order stays open; the next due date is typed or computed from the interval) and report_defect are in this skill. The checks describe the manager path.
Platform skill state Links point to the main branch of the platform skill, read on 2026-11-16. If a linked file has moved, look it up by name and report the broken link; do not guess its content.
Industry Businesses that keep a fleet, tools, devices or machines and must track recurring inspections and defects. ExampleWorks values are examples.
Tool count Not stated on purpose. Measure: GET https://mcp.telesherpa.com/health (field tools) and auth_status for what your account sees.

Goal

Managers maintain sites, people and assets (vehicles, devices, tools, machines) in master data. Each recurring inspection duty is an open serviceOrder in the maintenance scope: the due date, the interval and the kind live on that order, not on a second requirement type. The order is linked to its asset with concerns and linkvalue ofAsset.

Managers work from start cards on the team door: overdue inspections, inspections due from {today} through {today+30}, all open inspections (defects excluded), and open defects. Record inspection opens a form on an open or in-progress order. Saving it creates a protocol (serviceOrder with orderKind=inspectionProtocol) linked to the duty with concerns / ofOrder, stores the result, note, photos and signature on that protocol, and writes result, lastDone and the next dueDate back to the duty. If the next due date is left empty, it becomes the inspection date plus intervalDays; if a date is entered, that date is used. The duty's orderStatus stays open, so the same row remains on the lists when it is due again. Report defect on an asset creates a new serviceOrder with orderKind=defect in the maintenance scope, linked to that asset.

The operating picture — flows, how an agent measures and steers the workspace, and what the agent never does alone — is in operating-model.md.

Charts and reports: offer them, do not build them yourself. A member cannot build a report; order it through the service channel. The menu, the wording and the request template are in the platform skill: reports.md. What a member can build is a block view.

Definition of Done — per phase, checkable

"The workspace is configured" means one sentence, and it has a test: a person who has never seen the build can open the start cards, see overdue and upcoming inspections with their asset names, record an inspection (result, photo, signature, date, and either a typed next due date or none) so the same order stays open with the new due date, and report a defect on an asset — without asking anyone. Everything below is a precondition for saying that, not a description of it.

Phase Minimum artefact The proof you must quote
0 three scopes with the agreed suffixes, the rights matrix, types activated, property definitions in the maintenance scope ontouser_scope_index lists three; onto_type_show on serviceOrder in the maintenance scope quotes the fields above
1 business and site (reused or created), people, assets, one open serviceOrder per agreed duty, each linked concerns / ofAsset object counts per type; one order read back with dueDate, kind, orderKind and a single ofAsset edge
2 the four lists (work and team counterparts), start cards on the team door, record_inspection (form, function, triggers), report_defect start cards quoted from onto_startcard_index; one recorded inspection stays open with a computed or typed dueDate and a protocol linked ofOrder; one defect appears in the defects view and not in all open inspections; saving without a result or without an inspection date is refused

The hard rule: the workspace counts as configured only when acceptance-scenario.md has run end to end once and its result is quoted, step by step. Until then the status is "stage X of 2".

"Created" is not "configured". An object list proves that rows exist. A working workspace proves that the next person can open the lists, record an inspection and report a defect.

Build order — phases 0–2

Every phase file uses the same frame: goal · definitions · config snippets · checks via MCP · checks in the browser · acceptance · typical errors.

Phase File Core
0 phase0.md three scopes, rights matrix, object types, properties, link types, smoke test
1 phase1.md reuse or create sites and people, assets, recurring service orders, concerns / ofAsset
2 phase2.md views, start cards, record_inspection (form, function, triggers), report_defect

Before you start: prerequisites.md → intake.md (ask the business, do not guess) → phase 0. End-to-end check: acceptance-scenario.md. Paid test runs: measurement.md. Operating model: operating-model.md.

Working conventions for every phase:

  • Test objects carry the prefix TEST-<phase>- in name and external_id.
  • Save the current definition (read it, keep the JSON) before you change it.
  • Read back after every write. A write response describes intent, the read-back describes state.
  • One write at a time. Do not fire parallel creates of objects or links; a timeout leaves you unsure what landed.

Core rules (read before phase 0)

Short form. The platform references linked below are authoritative.

  1. The open serviceOrder is the source of truth for the deadline. dueDate, intervalDays, kind and lastDone hang on the order. Do not treat comfort date fields on the asset as the duty, and do not invent a second requirement type. One open scheduled order per asset and kind is the duty.
  2. E2 split — basic vs protected. Master objects hold basic data (name, login e-mail, site, asset identifiers). Contractor commercial terms do not belong on those objects. See scopes-and-permissions.md.
  3. The asset column needs concerns with linkvalue ofAsset. Create that value on the edge. An edge with an empty linkvalue leaves the asset name blank in the lists. If the edge already exists without the value, update that edge; do not add a second concerns link. Each scheduled order points to one asset.
  4. record_inspection is a form, and it keeps the duty open. The action type is form_answer, bound to a formdef. Saving creates a protocol (orderKind=inspectionProtocol, orderStatus=done) linked to the duty with concerns / ofOrder. Photos and the signature live on the protocol, not on the duty. A function apply_inspection, run by insert and update triggers on that protocol, writes result, inspectionNote, lastDone and dueDate to the duty. It does not set orderStatus, completedAt or description on the duty. Closing the duty would drop the recurring row out of the lists.
  5. Next due date: typed date wins, otherwise inspection date plus interval. If nextduedate is a real YYYY-MM-DD date, that value becomes dueDate. If the field is left empty, the function uses date_add(lastdone, intervalDays) on the duty. Empty form fields are not stored, so a placeholder such as {nextduedate} can arrive as literal text; the function must accept a next due date only when it matches YYYY-MM-DD.
  6. Photos and signature belong in the formdef, not in action prompts. Action prompts accept only text, textarea, int, float, select, picker, switch, date, datetime and time. Use form widgets images and signature. Date fields on the form use widget datepicker with mode: date and values YYYY-MM-DD. Form widget keys are stored as they are written (lastdone, nextduedate, result, note); trigger placeholders must use those exact keys, not camelCase duty field names.
  7. report_defect creates the defect order. The form action, run on an asset, writes a serviceOrder with orderKind=defect and orderStatus=open into the maintenance scope and sets concerns / ofAsset. Recording an inspection with result=defect does not create a second defect order; use report_defect when a defect order is needed.
  8. All open inspections exclude defects. That view filters orderStatus != done and orderKind != defect. Defects have their own view (orderKind = defect and orderStatus != done).
  9. The 30-day list is a fixed window. It filters orderStatus != done and dueDate >= {today} and dueDate <= {today+30}. The placeholders stay stored as {today} and {today+30}; do not replace them with a fixed date. The window is not a navigable period. Overdue is orderStatus != done and dueDate < {today}.
  10. Start cards live in the team scope and point at team-scope views. A card that points at a work-scope view is rejected (HTTP 400). Install the counterparts in the team scope first, then the cards.
  11. List rows need a hidden udid column for row actions. Put system column udid, hidden: true, first. Then row_actions can run record_inspection on the row and can include a detail link ontouser/object/show/{udid}. Without the hidden column, the row action has no object to run on.
  12. Do not set data_scope_id on the inspection lists. A person-binding on the view would hide unassigned orders.
  13. Action conditions use operator ne, not neq. Unknown operators are not treated as a match, so a condition written with neq can hide the button. View filters use operators such as !=, <, >=, <=.
  14. Rights are fail-closed. No grant means no access; an empty list means empty. Set read, write and manage explicitly.
  15. Delete one id at a time. Never by name, prefix or pattern. Deleting costs the delete_* price from the live table (see prerequisites).
  16. UDIDs always lower case. Mixed case silently never matches.
  17. Every manager view in the maintenance scope sets view_config.access.require to write. Team counterparts of the deadline and defect lists set access.require to the maintenance scope id. The asset list used to report a defect has no such gate.
  18. Create an action with exactly one scope in body.scopes. Add further scopes in a later save. A create call with several scopes is rejected (HTTP 400).
  19. ontouser_scope_types_set replaces the list. Include every type the scope must keep.
  20. Time: stored and returned as UTC, with the _local/value_local sibling in the viewer's zone. Naive input is read in the viewer's zone (default Europe/Berlin, measured 2026-11-25: 2026-11-10 09:00:00 is stored as 08:00:00 UTC); append Z or an offset (2026-11-10T09:00:00Z) and it is taken literally.
  21. Prices only from the live list. Call onto_credit_pricing at the start of the run. Do not copy a price table from memory or from this skill. The platform skill and tool-traps.md describe how to read it.

Link types of this solution — use these, invent none

Link Direction What it carries
concerns (linkvalue ofAsset) serviceOrder → asset (car, device, tool, machine, building) the asset the duty or defect is about. Set when the order is created; required for the asset column
concerns (linkvalue ofOrder) protocol → duty (both serviceOrder) the open inspection the protocol belongs to. Set by record_inspection
bestehtAus organisation → building (and further, if used) the site tree, same as shift-planning

No invention. A link type that is not in onto_link_index with matching types1 and types2 for the pair you need does not exist for you. And: a link you have not read back with onto_object_graph or onto_object_show does not exist in the report either.

Platform references (do not duplicate them here):

Topic Reference
Scopes, rights, three-scope pattern scopes-and-permissions.md
Scope bridges (result_scope_id) scope-bridges.md
Tool traps, prices, time, async triggers tool-traps.md and references/tool-traps.md
Reports and charts — what to order for the manager reports.md
Member-agent rules member-agent-rules.md
Notifications notifications-and-link-events.md
Start cards start-cards.md
Forms form-engine.md
Block views view-blocks.md
Triggers and functions automation-and-functions.md
Managed staff accounts, invite codes company-manager.md
People, sites, three-scope recipe shift-planning, especially phase 0 and phase 1

Stop and escalate

Stop, do not improvise, and report when any of these happens. Inventing a workaround is forbidden — e.g. closing a recurring order so it "looks done", inventing a second requirement type, or leaving concerns without ofAsset because the name "still shows in the object header".

Situation What you do
HTTP 402 The executing account has no credits. Check onto_credit_balance of that account. Stop and ask for credits. Do not retry.
HTTP 403 / scope write refused Check rights. If the design says the account must not have the right, the fix is a bridge or a gate, not a grant.
HTTP 400 on record_inspection when dates are filled Check that the form date widgets use mode: date and the client sent YYYY-MM-DD. Fix the definition; do not widen fields to date-time.
Required object type missing from ontouser_scope_types / onto_type_show Stop. File ontouser_service_request (template in prerequisites.md). Do not substitute another type silently.
A tool reports unknown parameters Read the allowed keys and fix the call once. If the documented parameter is not accepted, stop and report (the skill is out of date).
Smoke test (phase 0) deviates from this skill Stop before building. Report the deviation with tool, call and response.
MCP timeout / connection drop on a write Read back. Only repeat if the read-back proves nothing was written.
3 consecutive failed attempts at the same step, or spend above the agreed budget Stop and report (see measurement.md).
The business is not on Europe/Berlin time Stop before phase 0 and file ontouser_service_request.
Anything that would message real people outside a test Ask the human first.
Intake answer missing (sites, kinds and intervals, who records inspections) Ask; do not assume ExampleWorks defaults for a real customer.
You are about to report completion Stop. Run the checks above and quote the values.

Report format (to the human and, for platform faults, via ontouser_service_request with category: "bug"): what you tried (tool + arguments without secrets), what you expected, what came back (status + error text), what you did not do because of it.

Report shape — use this, every time

Stage X of 2 (0–2).

| Check | Value read back |
|---|---|
| scopes                | 3 — …_master, …_maintenance, …_team |
| objects per type      | person …, building …, car …, device …, tool …, machine …, serviceOrder … |
| views / start cards   | four work lists + five team views; five start cards on the team door |
| actions               | record_inspection (form_answer, order stays open), apply_inspection, report_defect |
| sample order          | concerns/ofAsset → asset … ; dueDate … ; orderStatus open |
| last inspection       | result / lastDone / dueDate quoted (typed or computed); protocol ofOrder; orderStatus still open |
| last defect           | one open defect on the asset; not in all open inspections |
| acceptance steps      | k of 17 passed (0.1 … 2.8), negative tests m of 2 open |

Not done: <bullet list, each with the stage it belongs to>

Two lines are forbidden in this report: "everything is set up" and "done". The count of passed acceptance steps is the only honest answer to "are you finished" — the scenario has 17 steps (0.1 … 2.8) and 2 negative tests (N1–N2). Both counts are in the acceptance file; do not restate them from memory.