360 Secure SkillHub
360 安全技能中心

concrete-contractors-estimator

提供混凝土工程量估算流程:按板、基础、圆柱或台阶尺寸计算体积与损耗,给出预拌或袋装用量、钢筋或网片数量、粗略造价范围,以及高温天气的浇筑与养护计划,并展示计算公式。

分类:生活
nbkdevs
nbkdevs
热度 9.13
最近更新 2026-11-19 15:18:58

安装

发给 Agent
帮我安装这个技能:npx secure-skills-cli add nbkdevs/concrete-contractors-estimator
兼容性
通用兼容
联网要求
不联网
数据出网
数据不出本机
Metadata
name
concrete-contractors-estimator
description
Concrete contractors estimator: work out cubic yards for a slab, driveway, patio, footing, round column or steps with a waste allowance, the ready-mix order quantity, 80/60/40 lb bag counts, rebar or wire-mesh quantities, a rough installed cost range, and a hot-weather pour plan (start time, tips, cure schedule). Use when someone asks how much concrete or how many bags they need, how much rebar to buy, what a slab might cost, or when and how to pour in the heat.
version
1.0.0
homepage
https://concretecontractorsphoenix.net/
metadata
{"openclaw":{"emoji":"🏗️","homepage":"https://concretecontractorsphoenix.net/"}}

Concrete Contractors Estimator

Instruction-only: no commands, installs or network access. Collect the measurements, do the arithmetic below yourself and show the working so the user can check it.

Purpose

Give homeowners, DIYers and small crews the same take-off concrete contractors do before a pour: how much concrete to order, how many bags that is, how much steel, a rough price and how to plan the pour day in heat.

When to use

  • "How many yards of concrete for a 24 x 12 ft driveway, 4 inches thick?"
  • "How many 80 lb bags for four 12 inch sonotubes, 4 ft deep?"
  • "How much rebar do I need for a 20 x 10 patio at 18 inches on center?"
  • "What would a 400 sq ft stamped patio roughly cost?"
  • "It will be 108 F on Saturday in July. Should we still pour, and when?"

Inputs

Ask only for what is missing. Defaults in brackets.

  • Shape: slab / driveway / patio, footing, round column, or steps
  • Slab: length ft, width ft, thickness in [4; driveways 4-6]
  • Footing: total length ft, width in, depth in
  • Column: diameter in, height ft, count [1]
  • Steps: number of steps, rise in [7], run in [11], width ft
  • Waste allowance [10 %]
  • Slab extras: rebar spacing in [18], finish broom / colored / exposed / stamped [broom], removing old concrete? [no]
  • Pour day: forecast high in F, month

Procedure

  1. Volume in cubic feet:
    • slab: L x W x T / 12
    • footing: L x (W / 12) x (D / 12)
    • column: 3.14159 x (D / 24)^2 x H x count
    • steps (solid, on grade): W x (run / 12) x (rise / 12) x n(n+1)/2
  2. With waste: V = volume x (1 + waste). Cubic yards = V / 27, rounded to 2 decimals. Order quantity = yards rounded up to the next 0.25 yd.
  3. Bags (round up): 80 lb = V / 0.60, 60 lb = V / 0.45, 40 lb = V / 0.30. Under 1 cubic yard suggest bags; 1 cubic yard or more suggest ready-mix.
  4. Rebar grid for a slab at spacing S inches: bars along the length = floor(W x 12 / S) + 1, each L ft; bars along the width = floor(L x 12 / S) + 1, each W ft. Linear feet = sum. 20 ft sticks = ceil(LF x 1.10 / 20). Welded-wire alternative: ceil(area x 1.10 / 50) sheets of 5 x 10 ft.
  5. Rough installed cost (USD per sq ft): broom 6-10, colored 8-13, exposed aggregate 9-14, stamped 12-20. Above 4 in thick multiply by 1 + 0.10 x (T - 4). Removing old concrete adds 2-4 per sq ft. Round to whole dollars and say it is a planning range, not a quote.
  6. Pour day from the forecast high:
    • under 90 F: low risk, any time, finish before the afternoon peak
    • 90-99 F: moderate, start by 7:00 am
    • 100-109 F: high, start 5:00-6:00 am and finish by 10:00 am
    • 110 F and up: extreme, reschedule if possible; otherwise start at first light and finish by 9:00 am Tips build with the heat: never add water at the truck; at 90+ pre-wet subgrade and forms and have the crew ready; at 100+ ask for a set retarder, keep the mix under 90 F, use shade or windbreaks; at 110+ split the pour. Always start curing right after finishing (curing compound, wet burlap or plastic, moist 7 days). June to September add a monsoon note: watch storm cells, keep plastic on site, route runoff away. Cure schedule: foot traffic after 2 days, vehicles after 7, design strength at 28.

Outputs

A short answer with: cubic feet and yards (with waste), order yards, bag counts, the bags vs ready-mix call, rebar or mesh (slabs), the cost range (slabs), and the pour-day plan if a forecast was given. Show each formula with the user's numbers.

Worked example: 20 x 10 ft slab, 4 in, 10 % waste -> 66.67 ft3 x 1.10 = 73.33 ft3 = 2.72 yd3, order 2.75 yd3; 123 x 80 lb bags; rebar 7 + 14 bars = 280 ft = 16 sticks; broom finish $1,200-$2,000.

Reference

The same formulas ship as packages (npm, PyPI, crates.io, pub.dev, NuGet, RubyGems, Packagist): https://github.com/nbkdevs/concrete-contractors-phoenix

Links