work-estimation-en

该 Skill 面向软件开发工作量估算:接收需求描述文本或 .md/.docx/.txt 文档,由 AI 拆分为分析、设计、前端、后端、算法、测试等工作模块,从工作量、复杂度、风险、并行可行性与前置条件维度估算,输出含概览、维度明细、甘特图、风险、协调关系与成本的多工作表 Excel 报告。

jinqiu193
jinqiu193
热度 31.72
最近更新 2026-05-11 17:46:09
分类:数据依赖:代码执行 / 读写文件 / 内部调用大模型应用场景:报告撰写 / 任务管理 / 日程安排 / 财务

安装技能

复制下面的话术发给你的 Agent,它会通过 secure-skills 检索并安装该技能。

执行命令安装此 skill: npx secure-skills-cli add work-estimation
Metadata
name
work-estimation-en
description
Software Development Work Estimation Skill. Triggered when user mentions "work estimation", "project estimation", "effort estimation", "timeline assessment", "task breakdown", "man-hour calculation", "development cycle", or similar terms. Accepts user requirements text or documents, automatically breaks down work items and estimates effort, outputting Excel evaluation reports.
version
1.0.0

📊 Software Development Work Estimation

Automatically analyze user requirements, break them into specific work items, and estimate effort across multiple dimensions, outputting structured Excel reports.

Workflow

Step 1: Collect Requirements

User provides:

  • Requirements description (plain text)
  • Or requirements document path (supports .md, .docx, .txt formats)

Step 2: AI Requirements Breakdown

AI automatically:

  1. Analyzes requirement content
  2. Breaks down into specific work modules
  3. Categorizes by dimension (Analysis, Design, Frontend, Backend, Algorithm, Testing)

Step 3: Effort Estimation

For each work item, evaluate:

  • Workload (man-days)
  • Complexity (Low/Medium/High)
  • Risk Level (Low/Medium/High)
  • Parallel Feasibility
  • Prerequisites

Step 4: Generate Excel

Multi-sheet Excel report:

  • Overview
  • Dimension Details
  • Gantt Chart (Project Progress)
  • Key Risk Items
  • Coordination Relations
  • Cost Estimation

Output Description

Sheet 1: Overview

Work Module Analysis Design Frontend Backend Algorithm Testing Total
Module A 1 day 2 days 3 days 5 days 1 day 2 days 14 days

Sheet 2-7: Dimension Details

Work content, estimation basis, and estimated hours by dimension.

Sheet 8: Gantt Chart

Visual display of parallel work, critical path, and milestones. Automatically skips weekends and holidays.

Sheet 9: Key Risk Assessment

Items with high risk or uncertainty are listed separately with explanations and recommendations.

Sheet 10: Coordination Relations

Dependencies between work items, prerequisites, and coordination matters.

Sheet 11: Cost Estimation

Three parts:

  • Labor Cost: Role × man-days × daily rate
  • Hardware/Software Cost: Servers, domains, SSL, third-party services
  • Total Budget: Includes 15% contingency buffer

Estimation Reference

Complexity Frontend Backend Algorithm Testing
Low 1-2 days 1-3 days 1-3 days 0.5-1 day
Medium 3-5 days 3-7 days 3-7 days 1-3 days
High 5-10 days 7-14 days 7-14 days 3-5 days

Notes

  • Estimation based on standard team config (1 frontend, 1 backend, 1 tester)
  • Parallel work reduces calendar time, not man-hours
  • Reserve 10-20% buffer for changes
  • Adjust based on actual team situation

Example

User: Help me estimate this project: Develop an e-commerce mini-app with user login, product display, shopping cart, and order payment

AI:

Got it! I'll help you with the work estimation.

Based on your requirements, I've broken them down into:

📦 **Work Modules**
1. User System (login, register, profile)
2. Product Module (list, detail, search)
3. Shopping Cart Module
4. Order Module
5. Payment Module
6. Infrastructure (routing, state management, API)

Generating detailed estimation report...