Project Manager

用于管理工程与软件项目全生命周期:发现或初始化规范项目,规划任务与代理协作,维护需求、追溯、变更、基线和验证证据,运行审计并执行发布门禁;不构成 SPICE 或 Automotive SPICE 认证。

aminekhettat
aminekhettat
热度 15.00
最近更新 2026-09-17 15:04:29
分类:协作依赖:代码执行 / 读写文件 / 第三方 API应用场景:任务管理 / 工作流 / 报告撰写 / 模板

安装技能

复制下面的话术发给你的 Agent,它会通过 secure-skills 检索并安装该技能。

执行命令安装此 skill: npx secure-skills-cli add engineering-project-manager
Metadata
name
project-manager
description
Manage substantial engineering and software projects end to end: discover or bootstrap the canonical project, define scope and work breakdown, coordinate agents, maintain requirements and traceability, control changes and baselines, audit quality, and enforce release readiness. Use for project planning, status, execution, recovery, change control, or release-gate requests.
user-invocable
true
license
MIT-0
compatibility
Linux, Python 3.10+ and Git. GitHub/GitLab bootstrap additionally needs authenticated gh/glab; SSH remotes need SSH access.
metadata
{"openclaw":{"requires":{"bins":["python3","git"]},"os":["linux"],"homepage":"https://github.com/aminekhettat/engineering-project-manager"}}

Project Manager

Independent SPICE-like workflow assistance; not SPICE or Automotive SPICE certified, endorsed or approved. Checks do not establish formal conformity or a capability level. Read docs/SPICE-SCOPE.md when explaining the process basis.

Manage one canonical project space per real project. Reuse an existing matching project before creating anything. Main remains accountable for scope, decisions, coordination, evidence, and communication with the user.

Resolve the installed skill directory from this file before running commands. Commands below run from that directory; replace PROJECT with the absolute canonical project path. Do not assume the skill is inside the project.

1. Discover or establish the project

  1. Search the project index and repositories for an existing matching project.
  2. Read 00-project/PROJECT.md, PROCESS-SCOPE.md, STATUS.md, task state, risks, decisions, requirements, and configuration records when present.
  3. If no project exists, follow references/project-initialization.md. Ask the missing questions in manageable groups: objective, scope, disciplines, owners, constraints, repository, infrastructure, CI, delegation and delivery. Reuse already-known answers. Never request secret values.
  4. Confirm the archetype's default disciplines and any additions among SYS, SWE, HWE, MLE, MECH and CYBER. Do not silently remove mapped domains.
  5. Prepare and review the resolved setup, then use the canonical bootstrap:
python3 scripts/bootstrap_project.py --help
python3 scripts/project_setup.py --help

Do not declare bootstrap complete until its canonical Git remote is reachable, the expected branch is synchronized, and BOOTSTRAP-STATUS.json says COMPLETE.

Done when: one canonical project root and repository are identified, or the missing decision/access is explicitly blocked.

For an existing project, use read-only scripts/migration_assess.py and scripts/project_report.py. Keep Git canonical for engineering state; Drive is optional complementary document storage. Do not reinitialize existing records.

2. Plan executable work

Build the hierarchy objective → outcomes → workstreams → phases → milestones → tasks. Give substantial tasks a stable identifier, owner, priority, dependencies, acceptance criteria, expected deliverable, and blocker state. Use BACKLOG, READY, IN_PROGRESS, BLOCKED, REVIEW, REWORK, DONE, or CANCELLED. DONE always means acceptance evidence has been checked.

Use the task-state engine for deterministic transitions:

python3 scripts/project_state.py --help

Keep work in progress small. Never start work whose dependencies, acceptance criteria, access, or mandatory safety decision are unresolved.

Done when: the next executable tasks are READY and ownership is unambiguous.

3. Execute and coordinate

For each cycle:

  1. refresh project state;
  2. select the highest-priority READY work without conflicts;
  3. move it to IN_PROGRESS;
  4. delegate to the appropriate specialist when useful;
  5. collect the concrete result and evidence;
  6. move it to REVIEW;
  7. apply the relevant Definition of Done and engineering gates;
  8. accept to DONE only on verified evidence, otherwise REWORK or BLOCKED;
  9. update status, traceability, risks, decisions, and configuration records.

Use references/execution-engine.md for transitions and references/agent-delegation.md for capability discovery, bounded contracts, isolated work, monitoring, retries and reviewed integration. Prepare a contract with scripts/delegation_plan.py; it does not dispatch or grant access. Configured agent/worker labels must be verified against the runtime. Main accepts work as DONE only after review; reviewer names in records are labels, not access controls.

Done when: state, evidence, and user-facing status agree.

4. Maintain engineering control

For requirement syntax and revision-aware traceability, read docs/REQUIREMENT-DATA-MODEL.md. For domain-specific work products, read only the relevant reference:

  • SYS: references/system-engineering.md
  • SWE: references/software-engineering.md
  • HWE: references/hardware-engineering.md
  • MLE: references/machine-learning-engineering.md
  • MECH: references/mechanical-engineering.md
  • CYBER: references/cybersecurity-engineering.md

Templates under templates/ are canonical source assets used by bootstrap. Do not edit generated project copies when the intent is to change the skill.

Run project checks during development:

python3 scripts/project_audit.py PROJECT
python3 scripts/requirements_lint.py PROJECT
python3 scripts/traceability_check.py PROJECT
python3 scripts/domain_audit.py PROJECT

Done when: required work products exist and traceability is internally consistent for the current lifecycle state.

5. Control changes and baselines

Read docs/CHANGE-BASELINE-MANAGEMENT.md and references/document-configuration-management.md before changing released requirements or configuration items.

Use the deterministic CLIs rather than editing registries manually:

python3 scripts/change_manager.py --help
python3 scripts/baseline_manager.py --help
python3 scripts/configuration_audit.py PROJECT --strict

Released requirement revisions and frozen baseline snapshots are immutable. Use a Change Request and a new requirement revision; change baseline lifecycle metadata only through its CLI, preserving history and supersession links.

Done when: the authoritative registries validate and affected baselines are consistent.

6. Record verification evidence

Read docs/VERIFICATION-EVIDENCE.md before planning or recording verification proof. The authoritative registry is machine-readable; Markdown views are generated, never edited by hand:

python3 scripts/verification_evidence.py --help
python3 scripts/verification_evidence_audit.py PROJECT --strict

Evidence attaches to an exact requirement revision, follows the requirement's prescribed verification strategy, and only a compatible PASS record covers that revision at the release gate. Truly legacy projects without management records or prior enablement are skipped; deleting an existing marker cannot disable its audit. Opt in explicitly with init and review assess before recording anything.

Done when: every active requirement revision has compatible PASS evidence, or uncovered revisions are known release blockers.

7. Gate a release

Before release, manage risks, problems, milestones and external obligations using docs/MANAGEMENT-EXTENSIONS.md. New projects initialize these registries; existing projects opt in explicitly using scripts/management_init.py. Preserve legacy documents and do not infer completed work from empty registries.

Read docs/RISK-PROBLEM-MANAGEMENT.md for risk acceptance and verified problem closure; docs/MILESTONE-MANAGEMENT.md for task/criterion evidence and milestone waivers; docs/INTAKE-COMPLIANCE.md for reviewed source versions and obligation coverage. Use the CLIs, never edit JSON or generated Markdown by hand. Risk acceptance and exclusions require an accountable decision already authorized by the user; an agent must not invent acceptance to make the gate green.

python3 scripts/management_audit.py PROJECT
python3 scripts/management_audit.py PROJECT --release

Resolve release-blocking problems, high unaccepted risks, required milestones and uncovered external obligations before freezing the candidate. New management records are controlled content: changes after a freeze need a new candidate. Record IDs remain stable; history and sealed evidence must remain auditable.

A release candidate must pass the complete gate:

python3 scripts/release_check.py PROJECT

Do not represent bootstrap success as release readiness. A release requires valid governance, requirements, traceability, domain evidence, configuration control, verification evidence coverage, a clean Git state, commit consistency, and G3 readiness.

Done when: the release gate exits 0 for the exact candidate commit, or the blocking findings are recorded.

8. Deeper guidance and maintenance

The detailed governance rules and Definitions of Done remain in references/project-manager-handbook.md; consult only the sections needed for the current project. Remaining capability gaps are tracked in docs/INDUSTRIALIZATION-ROADMAP.md.

For changes to the skill itself, use the source repository's contribution guide. Contributor tests and publication tools live in that repository, outside the installed runtime. Never publish a project workspace or private Git history.